الجدولة الفعالة للعمليات الانتاجية

Authors

  • القنيدي الزواوي
  • سالم زويتة

DOI:

https://doi.org/10.36602/ijeit.v6i1.295

Abstract

mceclip0-de5712d9b37586b578e5aec8dd7ba91b.png

Downloads

Download data is not yet available.

References

]7[ Chen, J. (2006), "Single-machine scheduling with flexible

and periodic maintenance", The Journal of the

Operational Research Society. Vol. 57, No.6. Pp.703710.

]8[ Chantaravarapan, S. (2004), "Single Machine Group

Scheduling with setups to Minimize Total Tardiness".

]9[ Steve, J. Kanet, J. (2006), " Single-machine scheduling

with early and tardy completion costs", Research

Logistics , Vol.40,pp.85-101.

Downloads

Published

2024-06-19

How to Cite

الجدولة الفعالة للعمليات الانتاجية. (2024). The International Journal of Engineering & Information Technology (IJEIT), 6(1). https://doi.org/10.36602/ijeit.v6i1.295