الجدولة الفعالة للعمليات الانتاجية
DOI:
https://doi.org/10.36602/ijeit.v6i1.295Abstract

Downloads
References
]7[ Chen, J. (2006), "Single-machine scheduling with flexible
and periodic maintenance", The Journal of the
Operational Research Society. Vol. 57, No.6. Pp.703710.
]8[ Chantaravarapan, S. (2004), "Single Machine Group
Scheduling with setups to Minimize Total Tardiness".
]9[ Steve, J. Kanet, J. (2006), " Single-machine scheduling
with early and tardy completion costs", Research
Logistics , Vol.40,pp.85-101.
Downloads
Published
Issue
Section
License
Copyright (c) 2016 The International Journal of Engineering & Information Technology (IJEIT)

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.










