الجدولة الفعالة للعمليات الانتاجية

Main Article Content

القنيدي الزواوي
سالم زويتة

Abstract

mceclip0-de5712d9b37586b578e5aec8dd7ba91b.png

Article Details

How to Cite
الزواوي ا., & زويتة س. (2024). الجدولة الفعالة للعمليات الانتاجية. The International Journal of Engineering & Information Technology (IJEIT), 6(1). Retrieved from https://ijeit.misuratau.edu.ly/index.php/ijeit/article/view/295
Section
Artical

References

]7[ Chen, J. (2006), "Single-machine scheduling with flexible

and periodic maintenance", The Journal of the

Operational Research Society. Vol. 57, No.6. Pp.703710.

]8[ Chantaravarapan, S. (2004), "Single Machine Group

Scheduling with setups to Minimize Total Tardiness".

]9[ Steve, J. Kanet, J. (2006), " Single-machine scheduling

with early and tardy completion costs", Research

Logistics , Vol.40,pp.85-101.